If you hold cost-reimbursable or time-and-materials contracts with the federal government, your indirect rates decide how much of your real costs you actually recover. Set them up badly and you either leave money on the table or invite questions from the contracting officer and the Defense Contract Audit Agency (DCAA). This guide explains the three most common indirect cost pools and how to keep them clean.

Direct vs. indirect costs

A direct cost can be traced to a single contract: the hours an engineer charges to Contract A, or materials bought only for that job. An indirect cost supports more than one contract or the business as a whole, such as health insurance, office rent or the accounting team. Indirect costs are grouped into pools and spread across contracts using an allocation base.

The three common pools

1. Fringe

Fringe covers employee-related costs that follow labor: payroll taxes, health and retirement benefits, and paid time off. The fringe rate is usually the fringe pool divided by total labor dollars.

2. Overhead

Overhead captures costs that support the people doing direct work, such as facilities, equipment and project-level supervision. It is typically allocated over direct labor, and larger contractors sometimes keep separate on-site and off-site overhead rates.

3. General & Administrative (G&A)

G&A covers running the company as a whole: executive management, finance, HR and business development. It is commonly allocated over a total cost input base, meaning direct costs plus fringe and overhead.

Keep unallowable costs out of the pools

The Federal Acquisition Regulation (FAR Part 31) lists costs the government will not reimburse, including entertainment, alcohol, interest expense, contributions and donations, lobbying, bad debts, and fines or penalties. They still belong in your books, but they must be identified and kept out of the pools that build your billing rates. The simplest way to do that is a chart of accounts with dedicated unallowable accounts, so the separation happens when the transaction is recorded rather than at year-end.

Provisional billing rates vs. actual rates

During the year you bill using provisional billing rates, which are estimates of your indirect rates. After year-end your actual rates are calculated and, for cost-type contracts, reported in the incurred cost submission, generally due six months after the end of your fiscal year. If your provisional rates drift far from actual, you either under-recover cash or owe money back. Reviewing actual rates against provisional rates every month catches that drift early.

Timekeeping is the foundation

Every rate depends on labor being charged correctly. Auditors expect employees to record time daily, charge it to the right contract or indirect account, and correct mistakes with a documented explanation. Weak timekeeping is one of the fastest ways to fail an accounting system review.

A monthly checklist

  • Reconcile all accounts and review the labor distribution report.
  • Confirm time was recorded and approved on schedule.
  • Move any unallowable costs into their own accounts.
  • Calculate year-to-date actual rates and compare them to provisional billing rates.
  • Check burn rate against funding on each contract.

How LAXERO helps

LAXERO Financial Consulting supports government contractors working in Deltek Costpoint, Unanet and GovCon-structured QuickBooks. We help design indirect rate structures, set up charts of accounts, review indirect pool allocations, calculate provisional billing rates and identify unallowable costs. Book a free consultation to talk through your setup.